• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Agricultural Technology
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Agricultural Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Peningkatan Efisiensi Produksi Susu Segar Kemasan Menggunakan Simulasi Arena (Studi Kasus UPTD Rembangan Dairy Farm, Jember)

    Thumbnail
    View/Open
    Irvan Maulana_repository.pdf (1.695Mb)
    Date
    2025-01-20
    Author
    IBRAHIM, Irvan Maulana Malik
    Metadata
    Show full item record
    Abstract
    Fresh milk is rich in nutritional components, so it plays an important role in health. Fresh cow's milk is beneficial for preventing diseases and strengthening the immune system, as well as the growth and development of human brain cells. One of the milk processing units in Jember Regency is Rembangan Dairy Farm. In this processing unit there is potential that can affect the efficiency of packaged fresh milk production, one example is the packaging process that only uses one machine where this can result in a long queue of materials. The purpose of this research is to identify the types and characteristics of operating variables in packaged milk production, design a production system simulation model, and build a scenario for increasing the production of packaged fresh milk. The method used in this research is to use ARENA simulation where this method is commonly used for system design and optimization so that it can help overcome the queuing problems that occur. The results of this study show that the initial production scenario model has a total process time of 16.2 hours with a total product of 152 liters of packaged milk. There are 3 types of improvement scenarios designed, namely, Scenario 1 by shortening the process time in the simulation model, Scenario 2 by adding process stations, and Scenario 3 is a combination of scenarios 1 and 2. The analysis results of the three types of scenarios that have been designed show that the most optimal scenario and can be applied to get optimal efficiency is scenario 3. The performance variable in this scenario has a total process time of 4.3 hours with the same total production.
    URI
    https://repository.unej.ac.id/xmlui/handle/123456789/127109
    Collections
    • UT-Faculty of Agricultural Technology [2754]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository