• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Evaluasi Hasil Perencanaan Bangunan Gedung Hijau pada Pembangunan Gedung ICU RSUD Ngudi Waluyo Kabupaten Blitar

    Thumbnail
    View/Open
    Alvin Ridla Firmansyah (2.079Mb)
    Date
    2024-05-22
    Author
    FIRMANSYAH, Alvin RIdla
    Metadata
    Show full item record
    Abstract
    Population growth in Indonesia causes an increase in the need for buildings every year. Many studies and information show that building construction has a negative impact on the environment. The Indonesian government has issued regulations governing the implementation of Green Buildings (BGH) as an effort to design sustainable buildings. However, the application of this rule is still very limited because it requires additional funds and a fairly complicated design. The government has advised that all building construction funded by the government is expected to have BGH implemented. Currently, the construction of the ICU building at Ngudi Waluyo Wlingi Hospital which is owned by the Blitar Regency Government is underway. Therefore, it is necessary to carry out an assessment of the implementation of BGH in the building and the efforts that must be made so that the BGH concept can be implemented as fully as possible within the required costs. Research was carried out through design planning reviews. This data will be assessed to assess the extent of BGH implementation in the building project. The research results obtained a percentage of 41%, this figure still does not meet the criteria for a primary level Green Building with a value of 45% -65%. Therefore, it is necessary to carry out a redesign that can be implemented so that the building meets the BGH criteria. The redesign includes site management, efficient use of energy, indoor air quality and waste management. After efforts were made to improve the performance of green buildings, an additional percentage of 12% was obtained, so that the final total percentage of green buildings at Ngudi Waluyo Hospital was 53%. The results of this recommendation resulted in an increase in the BGH achievement rating with the required budget plan (RAB) of Rp268.908.223,97.
    URI
    https://repository.unej.ac.id/xmlui/handle/123456789/121943
    Collections
    • UT-Faculty of Engineering [4281]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository