• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Kinerja Proyek Reparasi dengan Metode Earned Value Analysis di PT. XYZ

    Thumbnail
    View/Open
    REPOSITORY_M. IRFAN KURNIADI_201910701002_TKP.pdf (2.271Mb)
    Date
    2024-03-08
    Author
    KURNIADI, M. Irfan
    Metadata
    Show full item record
    Abstract
    Two ships are currently carrying out repair activities at PT XYZ to maintain optimal ship condition. During the repair process, both ships experienced delays, with a delay of 11 days for ship X1 and 2 days for ship X2. The aim of this research is to analyze the performance of repair projects on the two ships in terms of cost and time. This research uses the Earn Value Analysis (EVA) method to assess project performance. Based on the analysis of ship . In terms of cost performance index (CPI), the value is 1.47 (CPI>1), indicating that the costs incurred are lower than the initial estimate of the cost budget. This occurs because some work has been reduced while the project is being implemented.The project schedule performance index (SPI) of ship X2 is 0.68 (SPI<1), indicating that the project is experiencing a delay of 30.2% from the initially planned schedule of 100%, with a job achievement of 69.8%. In terms of cost performance, the value is 1.15 (CPI>1), indicating that the costs incurred are lower than the initial budget estimate. The total project cost (ETC) for ship X1 is Rp99,551,207.25, with the project completion cost (EAC) amounting to Rp914,152,500, where the project completion time is delayed, and the estimated time (TE) for project completion becomes 32 days if the work conditions remain the same as on day 19. For ship X2, the ETC is - Rp187,421,500.69 with the project completion cost (EAC) totaling Rp524,990,198, where the project completion time is delayed, and the estimated time for project completion becomes 20.59 days or increases by 1 day from the planned target
    URI
    https://repository.unej.ac.id/xmlui/handle/123456789/121195
    Collections
    • UT-Faculty of Engineering [4274]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository