Analisis Real Option Valuation Rencana Pembangunan Jalan Angkut Batubara Terhadap Ketidakpastian Produksi: Studi Kasus Provinsi Jambi
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Fakultas Teknik
Abstract
Indonesia’s 2026 coal production quota policy increases uncertainty for hauling road investments whose revenues depend on transported tonnage. This case study evaluates a planned 77 km hauling road in Jambi Province using Monte Carlo simulation, DCF, break-even, sensitivity analysis, and Real Option Valuation (ROV). Historical coal production data were projected using non-parametric historical bootstrapping with 10,000 iterations to generate P10, P50, and P90 secnarios. At a WACC of 9.58%, the DCF scenarios generated negative NPS ranging from -Rp3,101.73 billion to -Rp590.58 billion, with a P50 NPV of -Rp1,949.84 billion, as revenues cannot cover the Rp3,771.65 billion CAPEX. Break-even volume increased from 6.43 to 6.85 million tons due to OM cost escalation outstripping tariff increases. Sensitivity analysis identified volume and tariff as the primary drivers, although ±20% variations left NPV below zero due to high initial capital requirement. Using the P50 financial scenario, ROV increased project value, with Black-Scholes yielding an option value of Rp187.47 billion and an expanded NPV of -Rp1,762.37 billion, while the binomial lattice yielded Rp 143.19 billion and an expanded NPV of -Rp1,806.65 billion, with decisions dominated by wait and abandon. The results indicate that managerial flexibility alone cannot offset the capital requirement under production quota uncertainty.
Description
Validasi Rudy K