Analisis Real Option Valuation Rencana Pembangunan Jalan Angkut Batubara Terhadap Ketidakpastian Produksi: Studi Kasus Provinsi Jambi

dc.contributor.authorARZA NAUFAL JAFAR
dc.date.accessioned2026-10-27T00:48:39Z
dc.date.issued2026-10-16
dc.descriptionValidasi Rudy K
dc.description.abstractIndonesia’s 2026 coal production quota policy increases uncertainty for hauling road investments whose revenues depend on transported tonnage. This case study evaluates a planned 77 km hauling road in Jambi Province using Monte Carlo simulation, DCF, break-even, sensitivity analysis, and Real Option Valuation (ROV). Historical coal production data were projected using non-parametric historical bootstrapping with 10,000 iterations to generate P10, P50, and P90 secnarios. At a WACC of 9.58%, the DCF scenarios generated negative NPS ranging from -Rp3,101.73 billion to -Rp590.58 billion, with a P50 NPV of -Rp1,949.84 billion, as revenues cannot cover the Rp3,771.65 billion CAPEX. Break-even volume increased from 6.43 to 6.85 million tons due to OM cost escalation outstripping tariff increases. Sensitivity analysis identified volume and tariff as the primary drivers, although ±20% variations left NPV below zero due to high initial capital requirement. Using the P50 financial scenario, ROV increased project value, with Black-Scholes yielding an option value of Rp187.47 billion and an expanded NPV of -Rp1,762.37 billion, while the binomial lattice yielded Rp 143.19 billion and an expanded NPV of -Rp1,806.65 billion, with decisions dominated by wait and abandon. The results indicate that managerial flexibility alone cannot offset the capital requirement under production quota uncertainty.
dc.description.sponsorshipIr.Utari Retno Sulistyo Rini S.T. M.T.
dc.identifier.urihttps://repository.unej.ac.id/handle/123456789/15825
dc.language.isoOther
dc.publisherFakultas Teknik
dc.subjectreal option valuation
dc.subjectcoal hauling road
dc.subjectMonte Carlo simulation
dc.subjectinvestment feasibility
dc.titleAnalisis Real Option Valuation Rencana Pembangunan Jalan Angkut Batubara Terhadap Ketidakpastian Produksi: Studi Kasus Provinsi Jambi
dc.typeOther

Files

Original bundle

Now showing 1 - 5 of 7
Loading...
Thumbnail Image
Name:
221910901023 - ARZA NAUFAL JAFAR - BAGIAN DEPAN.pdf
Size:
664.26 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901023 - ARZA NAUFAL JAFAR - BAB 1.pdf
Size:
365.97 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901023 - ARZA NAUFAL JAFAR - BAB 2.pdf
Size:
587.39 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901023 - ARZA NAUFAL JAFAR - BAB 3.pdf
Size:
587.21 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901023 - ARZA NAUFAL JAFAR - BAB 4.pdf
Size:
705.38 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: