Analisis Real Option Valuation Rencana Pembangunan Jalan Angkut Batubara Terhadap Ketidakpastian Produksi: Studi Kasus Provinsi Jambi
| dc.contributor.author | ARZA NAUFAL JAFAR | |
| dc.date.accessioned | 2026-10-27T00:48:39Z | |
| dc.date.issued | 2026-10-16 | |
| dc.description | Validasi Rudy K | |
| dc.description.abstract | Indonesia’s 2026 coal production quota policy increases uncertainty for hauling road investments whose revenues depend on transported tonnage. This case study evaluates a planned 77 km hauling road in Jambi Province using Monte Carlo simulation, DCF, break-even, sensitivity analysis, and Real Option Valuation (ROV). Historical coal production data were projected using non-parametric historical bootstrapping with 10,000 iterations to generate P10, P50, and P90 secnarios. At a WACC of 9.58%, the DCF scenarios generated negative NPS ranging from -Rp3,101.73 billion to -Rp590.58 billion, with a P50 NPV of -Rp1,949.84 billion, as revenues cannot cover the Rp3,771.65 billion CAPEX. Break-even volume increased from 6.43 to 6.85 million tons due to OM cost escalation outstripping tariff increases. Sensitivity analysis identified volume and tariff as the primary drivers, although ±20% variations left NPV below zero due to high initial capital requirement. Using the P50 financial scenario, ROV increased project value, with Black-Scholes yielding an option value of Rp187.47 billion and an expanded NPV of -Rp1,762.37 billion, while the binomial lattice yielded Rp 143.19 billion and an expanded NPV of -Rp1,806.65 billion, with decisions dominated by wait and abandon. The results indicate that managerial flexibility alone cannot offset the capital requirement under production quota uncertainty. | |
| dc.description.sponsorship | Ir.Utari Retno Sulistyo Rini S.T. M.T. | |
| dc.identifier.uri | https://repository.unej.ac.id/handle/123456789/15825 | |
| dc.language.iso | Other | |
| dc.publisher | Fakultas Teknik | |
| dc.subject | real option valuation | |
| dc.subject | coal hauling road | |
| dc.subject | Monte Carlo simulation | |
| dc.subject | investment feasibility | |
| dc.title | Analisis Real Option Valuation Rencana Pembangunan Jalan Angkut Batubara Terhadap Ketidakpastian Produksi: Studi Kasus Provinsi Jambi | |
| dc.type | Other |
Files
Original bundle
1 - 5 of 7
Loading...
- Name:
- 221910901023 - ARZA NAUFAL JAFAR - BAGIAN DEPAN.pdf
- Size:
- 664.26 KB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 221910901023 - ARZA NAUFAL JAFAR - BAB 1.pdf
- Size:
- 365.97 KB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 221910901023 - ARZA NAUFAL JAFAR - BAB 2.pdf
- Size:
- 587.39 KB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 221910901023 - ARZA NAUFAL JAFAR - BAB 3.pdf
- Size:
- 587.21 KB
- Format:
- Adobe Portable Document Format
Loading...
- Name:
- 221910901023 - ARZA NAUFAL JAFAR - BAB 4.pdf
- Size:
- 705.38 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed to upon submission
- Description:
