Evaluasi Kinerja Alat Gali Muat dan Angkut untuk Mencapai Target Produktivitas (Studi Kasus: Tambang Batu Kapur PT United Tractors Semen Gresik)
Abstract
Not achieving productivity targets is a problem that often occurs in mining operations and is caused by several technical obstacles. PT United Tractors Semen Gresik set a productivity target of 250 tons/hour for loading and digging equipment and 60 tons/hour for transportation equipment. An analysis of factors that affect productivity needs to be studied in order to find out the causes of not achieving the productivity targets set by the company. This research was conducted on the limestone quarry of PT United Tractors Semen Gresik (UTSG) Tuban Unit, located in Sumberarum Village and Pongpongan Village, Kerek District, Tuban Regency, using quantitative research methods. Research begins with the formulation of problems and then data collection and processing. Data that has been processed and analyzed can then be the basis for determining efforts to improve the productivity of loading and transporting excavations. There are five loadings and six conveyances that have not reached the productivity target. Not achieving tool productivity targets due to low work efficiency, suboptimal tool distribution time, and a combination of a less than ideal number of tools. In this study, productivity improvement was carried out by reducing the actual obstacle time in order to increase effective working time and tool efficiency.
Collections
- UT-Faculty of Engineering [4173]