• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Sodium Nitrat melalui Proses Sintesis dengan Kapasitas 25.000 Ton/Tahun

    Thumbnail
    View/Open
    Puput Suryaningrum Muhammad Iqbal Dwi Setyono Dita Meisya Widowati (1.287Mb)
    Date
    2024-06-25
    Author
    WIDOWATI, Dita Meisya
    Metadata
    Show full item record
    Abstract
    The sodium nitrate plant was established to supply all domestic sodium nitrate demands because there is no sodium nitrate plant operating in Indonesia. The sodium nitrate plant from sodium carbonate and nitric acid is designed with a production capacity of 25,000 tons/year. The plant is scheduled to operate in 2028 in the Krakatau Steel Industrial Estate in Cilegon City with a land area of 4.3 hectares. The process requires sodium carbonate as much as 2,010.5 kg/hour and nitric acid as much as 2,377.9 kg/hour. Sodium nitrate is produced through a synthesis process by reacting 53% sodium carbonate and 53% nitric acid in a Continuous Stirred Tank Flow Reactor (CSTR) at 60°C and 1 atm pressure with a reaction conversion of 98%. The reaction that occurs is exothermic so that the reaction temperature is maintained at 60 ° C using a cooling jacket. The sodium nitrate solution was concentrated to a concentration of 60% and then was formed into crystals and separated from impurities. Crystals stored in storage are pure sodium nitrate crystals with 98% content. Utilities supporting the process include water demand of 125,527.36 kg/hour, steam demand of 5,768.5633 kg/hour, fuel demand of 27538.610 kg/hour, and electricity demand of 364.62 kWh. The company form is a Limited Liability Company (PT) with a line and staff organizational structure. The number of factory employees is 154 people with a work system categorized into shift and non-shift employees. Based on Economic Analysis, the sodium nitrate plant is feasible to establish with consideration of various aspects including Annual Cash Flow (ACF) of Rp237,297,512,349, Pay Out Time (POT) for 3.49 years, and Break Event Point (BEP) of 45.83%.
    URI
    https://repository.unej.ac.id/xmlui/handle/123456789/122988
    Collections
    • UT-Faculty of Engineering [4299]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository