• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Propilen Glikol Dari Gliserol Dengan Kapasitas 40.000 Ton/Tahun

    Thumbnail
    View/Open
    191910401072_Lutfi Nanda Putri.pdf (1.524Mb)
    Date
    2023-05-29
    Author
    PUTRI, Lutfi Nanda
    Metadata
    Show full item record
    Abstract
    The plant design of a propylene glycol from glycerol with a production capacity of 40,000 tons/year to meet domestic demand for propylene glycol which fully relies on the import sector. The raw materials used are glycerol and hydrogen gas with Cu/ZnO/Al2O3 catalyst support. This plant will be established in Medan Deli District, Medan City, North Sumatra with a design operating time of 330 days/year. The production process consists of dehydration, hydrogenation, and separation processes. The dehydration and hydrogenation processes were carried out in a trickle bed reactor with a temperature of 235oC and a pressure of 38.45 atm. The reaction begins with the dehydration of glycerol to acetol and continues with the hydrogenation of acetol to produce propylene glycol. Propylene glycol is then purified in a flash drum to obtain propylene glycol with a purity of 99.6%. Hydrogen gas is separated and reused as a raw material. The process support unit consists of a water supply unit sourced from PT. KIM and Sungai Deli, steam supply unit from the boiler, electricity supply unit from PT. PLN and generators, fuel procurement unit in the form of diesel fuel, and waste treatment unit. The form of the company chosen is a Limited Liability Company (PT) and requires a total of 276 employees consisting of shift and non-shift employees. From the economic evaluation, the percentage of Annual Cash Flow (ACF) was 24.59%, Pay Out Time (POT) after tax for 3.5 years, and the percentage of Break Event Point was 50.77%. Based on these parameters, this factory is feasible to build.
    URI
    https://repository.unej.ac.id/xmlui/handle/123456789/118969
    Collections
    • UT-Faculty of Engineering [4274]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository