dc.description.abstract | The development of an increasingly rapid
industrial development resulted in increasingly intense
competition between industries. Companies are required to
maximize performance in various fields, especially by
meeting customer demand with agreed timeliness.
Scheduling is the allocation of resources to the time to
produce a collection of jobs. PT. Bella Agung Citra
Mandiri is a manufacturing company engaged in making
spring beds. The work stations in the company consist of 5
stages consisting of ram per with three machines, clamps
per 1 machine, firing mattresses with two machines,
sewing mattresses three machines and packing with one
machine. The model problem that was solved in this study
was Hybrid Flowshop Scheduling. The optimization
method for solving problems is to use the metaheuristic
method Migrating Birds Optimization. To avoid problems
faced by the company, scheduling is needed to minimize
makespan by paying attention to the number of parallel
machines. The results of this study are scheduling for 16
jobs and 46 jobs. Decreasing makespan value for 16 jobs
minimizes the time for 26 minutes 39 seconds, while for 46
jobs can minimize the time for 3 hours 31 minutes 39
seconds. | en_US |