• Login
    View Item 
    •   Home
    • LECTURER SCIENTIFIC PUBLICATION (Publikasi Ilmiah)
    • LSP-Conference Proceeding
    • View Item
    •   Home
    • LECTURER SCIENTIFIC PUBLICATION (Publikasi Ilmiah)
    • LSP-Conference Proceeding
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Modeling and scheduling engineering biotechnology building using bim and microsoft project

    Thumbnail
    View/Open
    FT_Jurnal_Paksitya Purnama Putra_Modeling and Scheduling Engineering Biotechnology.pdf (4.207Mb)
    Date
    2020-10-02
    Author
    MUHARANI, Monica Diesti
    RATNANNGSIH, Anik
    PUTRA, Paksitya Purnama
    Metadata
    Show full item record
    Abstract
    The development of education today is required to reflect specificity in future development achievements, the needs of infrastructure related to Biomass and Bioenergy shall be facilitated well. Related to this goal shall be supported with facilities and infrastructure that is integrated laboratory building. The construction activity of the laboratory that develops massively made complexity of work that needs quick method IT and project management based to monitoring and minimalize mistakes in development process. The performance of integrated project management overall is obtained using Building Information Modeling (BIM) concept. This article is using one of the features from BIM program that is Revit Architecture because it is capable to give 2D work picture output, 3D modelling and the volume of each work. The aim of this article is to model the building using BIM and to arrange scheduling using Ms.Project. Modelling only consider the structure and architecture work. The study case of this research is IsDB Engineering Biotechnology. Validation is done to check the volume of work from the result of modelling. The result of validation obtained is error (%). The result of Revit Architecture modelling that is done to the whole work has volume that corresponds to DEDC volume except to the reinforcement work. This happened because of the bending and hook reinforcement settings are using default setting so that the error is more than 0%. The result of Revit Architecture modelling is used as the guidelines for scheduling using Ms.Project. The length of time needed in building the IsDB Engineering Biotechnology building is 232 days.
    URI
    http://repository.unej.ac.id/handle/123456789/103307
    Collections
    • LSP-Conference Proceeding [1877]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository