dc.description.abstract | Electrical energy as one of the relevant infrastructure to the needs of the people, so
it’s very important in our life. Distribution of electrical energy must be able to
guarantee in an amount sufficient, good quality and reasonable price. Mayang feeder
is subdivison of PT PLN (Persero) Area Jember. The growth of electrical power loads
in Mayang feeder increase each years. Therefore, it needs forecasting load growth
for 2013 – 2017 period using the backpropagation method. Growth load (kVA) will
be simulated using ETAP software 7.0.0. For anticipation of this growth the
development of distribution planning. The development of distribution transformers
and enlarge the diameter of the conductor are the way to development of distribution
networks in Mayang feeder period 2013 - 2017. After the development of distribution,
the result of voltage drop can be decrease. The largest voltage drop results in 2017
amounted to 5.41 %. | en_US |