Browsing by Author Wahyono, Hadi

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 20 to 39 of 75 < previous   next >
Issue DateTitleAuthor(s)
2015Analisis Pengendalian Persediaan Barang Dagang Dengan Menggunakan Fixed Order Interval Pada Usaha Dagang Aries Jaya Jember (Analysis of The Inventory Control Using Fixed Order Interval on Aries Jaya Trading Venture Jember)Wahyono, Hadi; Handriyono; MULYANUS, TONNY
2016-01-13ANALISIS PENGENDALIAN PERSEDIAAN DENGAN MENGGUNAKAN FIXED ORDER INTERVAL PADA USAHA DAGANG ARIES JAYA JEMBERWahyono, Hadi; Mulyanus, Tonny
2016-01-13ANALISIS PENGENDALIAN PERSEDIAAN DENGAN MENGGUNAKAN FIXED ORDER INTERVAL PADA USAHA DAGANG ARIES JAYA JEMBERWahyono, Hadi; Mulyanus, Tonny
2016Analisis Pengendalian Persediaan Gabah Menggunakan Economic Order Quantity (EOQ) Multi Item Pada UD Ridwan Kaliwates Jember (The Analysis of Grain Stock Control Using Multi-item Economic Order Quantity (EOQ) Method at UD Ridwan Kaliwates Jember)Pudjo Musmediļ€¬, Didik; Wahyono, Hadi; FAHMI NUR ARDHI, M.
2016-11-16ANALISIS PENGENDALIAN PERSEDIAAN GABAH MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) MULTI ITEM PADA UD RIDWAN KALIWATES JEMBERMusmedi, Didik Pudjo; Wahyono, Hadi; Nur Ardhi, M. Fahmi
2016-08-09ANALISIS PENJADWALAN PRODUKSI MENGGUNAKAN METODE FCFS (FIRST COME FIRST SERVED), SPT (SHORT PROCESSING TIME), LPT (LONGEST PROCESSING TIME) DAN EDD (EARLIEST DUE DATE) PADA IYAN JAYA GARMENT JEMBERWahyono, Hadi; Pudjo, Didik; Suprihatin, Indah
-ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK GEDUNG PERAWATAN DAN INSTALASI BEDAH SENTRAL RUMAH SAKIT AL-HUDA GENTENG BANYUWANGI OLEH PT. MAKSI SOLUSI ENJINERING DENGAN METODE CPMBambang Gusminto, Eka; Wahyono, Hadi; Nuril Fabrian, Mochammad
-ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK GEDUNG PERAWATAN DAN INSTALASI BEDAH SENTRAL RUMAH SAKIT AL-HUDA GENTENG BANYUWANGI OLEH PT. MAKSI SOLUSI ENJINERING DENGAN METODE CPMBambang Gusminto, Eka; Wahyono, Hadi; Nuril Fabrian, Mochammad
2016-07-28ANALISIS PROSES PENGOLAHAN LIMBAH PRODUKSI DALAM MENINGKATKAN KUALITAS LINGKUNGAN PADA INDUSTRI KECIL MENENGAH CIPTA BATIK COLLECTION DENPASAR SELATAN BALIPudjo, Didik; Wahyono, Hadi; ERNAWATI
2016ANALISIS QUALITY FUNCTION DEPLOYMENT GUNA MENINGKATKAN MUTU LAYANAN INSTALASI RAWAT INAP PADA PUSKESMAS TEGALSARI BANYUWANGI Analysis of Quality Function Deployment for Improving Quality of Service Installation Ward on Tegalsari Health Center BanyuwangiWahyono, Hadi; Handriyono; PUTRA RAMADHAN, DANA
2016-11-23ANALISIS SUPPLY CHAIN MANAGEMENT TERHADAP KINERJA PERUSAHAAN DENGAN MENGGUNAKAN MODEL SCOR VERSI 10.0 PADA PERUSAHAAN DAERAH PERKEBUNAN BANONGAN KABUPATEN SITUBONDOHandriyono; Wahyono, Hadi; Rohimah, Umniyatur
2016Analisis Supply Chain Management Terhadap Kinerja Perusahaan Dengan Menggunakan Model SCOR Versi 10.0 Pada Perusahaan Daerah Perkebunan Banongan Kabupaten Situbondo (Analysis Of Supply Chain Management Of Company Performance Using SCOR Model Version 10.0 In Regional Company Banongan Estate District Situbondo)Handriyono; Wahyono, Hadi; ROHIMAH, UMNIYATUR
2017-01-20ANALISIS UPAYA UNTUK MENINGKATKAN PRODUKTIVITAS CERUTU PADA PABRIK CERUTU DI KOPERASI KARYAWAN KARTANEGARA JEMBERMusmedi, Didik Pudjo; Wahyono, Hadi; Satriarahmanda, Bima Eka
2016-01-20Analisis variabel-variabel yang mempengaruhi pengambilan keputusan konsumen dalam pembelian sepeda motor kawasaki pada PT. Surapita Unitrans cabang JemberWahyono, Hadi; Apriono, Markus; Soedarmono, Bekti Setyo
-ANALISIS WASTE DENGAN PENDEKATAN LEAN MANUFACTURING MENGGUNAKAN METODE WAM DAN VALSAT PADA PROSES PRODUKSI VENEER P.T. MUROCO JEMBERWahyono, Hadi; Handriyono; Devitami A., Jouris
2016Evaluasi Kinerja Supply Chain Management (SCM) pada UD. Asri Bakery Semboro (Evaluating Performance of Supply Chain Management at UD. Asri Bakery Semboro)Bambang Gusminto, Eka; Wahyono, Hadi; AYU WULANSARI, ARISKA
2016Evaluasi Kinerja Supply Chain Menggunakan Pendekatan Balanced Scorecard pada Angkasa Raya Furniture Banyuwangi (Performance Evaluation Supply Chain Used The Balanced Scorecard Approach in Angkasa Raya Furniture Banyuwangi )Wahyono, Hadi; Pudjo, Didik; AINI RIZQIYANTI, NUR
2016Evaluasi Penjadwalan Biaya Dan Waktu Proyek Dengan Metode CPM Dan PERT (Studi Kasus: Proyek Pembangunan Stadion Utama Jember Sport Garden (JSG) Kabupaten Jember) (Evaluation Of Project Cost And Time Scheduling With CPM And PERT Method (Case Study: The Main Stadium Construction Project of Jember Sport Garden (JSG) in Jember Ditrict) )Wahyono, Hadi; Handriyono; ROFI'I, SYAIFUL
-EVALUASI PENJADWALAN WAKTU DAN BIAYA PADA PROYEK PEMBANGUNAN RUMAH TIPE 30 DI ISTANA TEGAL BESAR KABUPATEN JEMBER DENGAN METODE CPMWahyono, Hadi; Gusminto, Eka Bambang; Iman, Firdaus Hidayatul
2015-12-22Evaluasi saluran distribusi pada perusahaan rokok kalpataru di MalangWahyono, Hadi; Suroso, Imam; Aries, Mokhamad Sulaiman