Please use this identifier to cite or link to this item:
https://repository.unej.ac.id/xmlui/handle/123456789/95287
Title: | ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK GEDUNG PERAWATAN DAN INSTALASI BEDAH SENTRAL RUMAH SAKIT AL-HUDA GENTENG BANYUWANGI OLEH PT. MAKSI SOLUSI ENJINERING DENGAN METODE CPM |
Authors: | Bambang Gusminto, Eka Wahyono, Hadi Nuril Fabrian, Mochammad |
Keywords: | ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK |
Abstract: | Estimasi waktu dan biaya pada suatu proyek membutuhkan metode yang tepat untuk mendapatkan hasil yang optimal. |
URI: | http://repository.unej.ac.id//handle/123456789/95287 |
Appears in Collections: | UT-Faculty of Economic and Business |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mochammad Nuril Fabrian - 130810201117 #.pdf | 2.14 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
Admin Tools