Optimasi Sequence Penambangan dan Timbunan pada Three Month Rolling Plan untuk Mencapai Target Produksi di PIT E PT pada IDI

dc.contributor.authorNANGGALA REY RAKHA KUSUMA
dc.date.accessioned2026-08-11T00:36:23Z
dc.date.issued2026-07-31
dc.descriptionFinalisasi Rudy K
dc.description.abstractProduction shortages at PT Pada Idi's Pit E in January and February, caused by operational limitations, required an optimized short-term mining plan. This study applies a Three Month Rolling Plan (3MRP) for March–May to optimize the mining sequence and disposal design and meet production targets. Adjusted monthly goals were 51,449 MT coal and 436,622 BCM overburden (OB), with a target stripping ratio (SR) of 8.45. The technical mining sequence design met these targets, achieving 438,925.98 BCM OB and 53,558.83 MT coal with SR 8.20 in March, 448,803.77 BCM OB and 53,274.00 MT coal with SR 8.42 in April, and 452,443.05 BCM OB and 53,498.18 MT coal with SR 8.46 in May. Design-to-target variations ranged from 1–4%, with a cumulative average SR of 8.36 whereas safely below the company's 8.5 limit. A disposal strategy was also developed to manage loose waste. Since existing capacity at OPD X Utara and OPD EC 2 was insufficient, four new waste dumps IPD 1, OPD 1, OPD 2, and OPD 3 were designed within mined-out areas beyond the LOM Pit E boundary, adding 1,397,433.99 LCM. Combined disposal capacity reached 1,628,813.78 LCM, including a 1% safety buffer. Fleet capacity analysis and productivity forecasting confirmed the adjusted targets were achievable using 4 OB fleets and 1 coal fleet over the three months. Forecasted production exceeded sequence requirements by 3% in March with 450,163.04 BCM OB and 71,801.25 MT coal, 0.26% in April 449,963.9 BCM OB and 71,769.49 MT coal, and 4% in May with 470,581.07 BCM OB; 76,497.59 MT coal. These results satisfied all company indicators, validating the technical and operational feasibility of the proposed 3MRP in overcoming prior production delays.
dc.description.sponsorshipIr.Utari Retno Sulistyo Rini S.T. M.T.
dc.identifier.urihttps://repository.unej.ac.id/handle/123456789/13522
dc.language.isoOther
dc.publisherFakultas Teknik
dc.subjectOptimization
dc.subjectThree Month Rolling Plan (3MRP)
dc.subjectMining Sequence
dc.subjectDisposal Design
dc.subjectForecast Production
dc.titleOptimasi Sequence Penambangan dan Timbunan pada Three Month Rolling Plan untuk Mencapai Target Produksi di PIT E PT pada IDI
dc.typeOther

Files

Original bundle

Now showing 1 - 5 of 7
Loading...
Thumbnail Image
Name:
221910901021 - NANGGALA REY RAKHA KUSUMA - BAGIAN DEPAN.pdf
Size:
655.24 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901021 - NANGGALA REY RAKHA KUSUMA - BAB 1.pdf
Size:
362.98 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901021 - NANGGALA REY RAKHA KUSUMA - BAB 2.pdf
Size:
550.77 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901021 - NANGGALA REY RAKHA KUSUMA - BAB 3.pdf
Size:
851.23 KB
Format:
Adobe Portable Document Format
Loading...
Thumbnail Image
Name:
221910901021 - NANGGALA REY RAKHA KUSUMA - BAB 4.pdf
Size:
2.24 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: