Analisa Biaya Pembangunan Gedung Selama Proses Life Cycle Gedung Menurut Peraturan Pemerintah Indonesia

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Fakultas Teknik Universitas Jember

Abstract

The results of life cycle cost research from outside Indonesia show that the ability to influence costs decreases continuously as the project progresses, from 100% when the project is approved to 20% or less when construction begins. While in Indonesia there are separate regulations related to the life cycle of buildings. This study will analyze the Life Cycle Cost of the UKM University of Jember Building by referring to the applicable Indonesian government regulations. The total LCC cost of the UKM University of Jember Building was Rp11,643,175,025.64. There is a significant difference between the percentage of LCC costs of building construction projects in Indonesia and outside Indonesia. The percentage of costs in building construction projects in Indonesia tends to be greater in the early stages of LCC, namely at the construction stage of 66.25%, while the percentage of building operation and maintenance costs is smaller than the percentage of construction costs. In building construction projects outside Indonesia, the largest percentage of LCC costs is in the building operation and maintenance stage of 60.3%, while the percentage of building construction costs is smaller than the percentage of operation and maintenance costs. The effect of costs on building construction projects in Indonesia and outside Indonesia is not significantly different.

Description

Reuploud file repositori 13 Apr 2026_Firli_Tata

Citation

Endorsement

Review

Supplemented By

Referenced By