IMPLEMENTASI PENGELOLAAN IRIGASI BERBASIS LIMA PILAR MODERNISASI IRIGASI DI BATANG ANAI SUMATRA BARAT
Date
2020-09-01Author
RISTIYANI, Suci
SAPUTRA, Tri Wahyu
PURNAMASARI, Ika
ARIF, Sigit Supadmo
Metadata
Show full item recordAbstract
The purpose of this research was to determine the irrigation modernization policy strategy
positioning at Batang Anai Irrigation System (IS). The irrigation modernization policy
determined by short-term and long-term. The data processed with AHP method and policies
taken based on SWOT method. The results of this study indicate that the Batang Anai IA strategy
for irrigation management systems included in the turn around quadrant III (Opportunities -
Weaknesses). Whereas the pillars of government institutions and human resources included in
the SWOT Defensive Strategy Quadrant (Weaknesses - Threats). The irrigation modernization
policy at Batang Anai begins with the accuracy and speed of responsse to damage on the canal
in accordance with the applicable operation and maintenance. In addition, the existing
operation and maintenance funds must also be adjusted to the real need for operation and
maintenance
Collections
- LSP-Jurnal Ilmiah Dosen [7302]