Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/95287
Title: ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK GEDUNG PERAWATAN DAN INSTALASI BEDAH SENTRAL RUMAH SAKIT AL-HUDA GENTENG BANYUWANGI OLEH PT. MAKSI SOLUSI ENJINERING DENGAN METODE CPM
Authors: Bambang Gusminto, Eka
Wahyono, Hadi
Nuril Fabrian, Mochammad
Keywords: ANALISIS PENJADWALAN WAKTU DAN BIAYA PROYEK
Abstract: Estimasi waktu dan biaya pada suatu proyek membutuhkan metode yang tepat untuk mendapatkan hasil yang optimal.
URI: http://repository.unej.ac.id//handle/123456789/95287
Appears in Collections:UT-Faculty of Economic and Business

Files in This Item:
File Description SizeFormat 
Mochammad Nuril Fabrian - 130810201117 #.pdf2.14 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools