Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/79985
Full metadata record
DC FieldValueLanguage
dc.contributor.authorPurnomo, Bambang Herry-
dc.contributor.authorSubayri, Ahmad-
dc.contributor.authorKuswardhani, Nita-
dc.date.accessioned2017-03-30T06:39:55Z-
dc.date.available2017-03-30T06:39:55Z-
dc.date.issued2017-03-30-
dc.identifier.issn1978-1555-
dc.identifier.urihttp://repository.unej.ac.id/handle/123456789/79985-
dc.descriptionJurnal Agroteknologi Vol. 09 No. 02 (2015)en_US
dc.description.abstractAs we know, fermented cassava (TAPE in indonesian language) is one of popular food in Jember Regency. There are a lot of fermented cassava industry at Jember Regency. One of the major problem for fermented cassava industry is decreasing of cassava production. The aim of this research was to design a dynamic system model of cassava availability for fermented cassava industry using dynamic system methods. Model of cassava availability consist of 3 sub models; model of supply, model of consumption and model of industrial demand. Based on simulation results it was known that in 2004-2013 the availability of cassava continues to decrease.The decreasing happenned because tape industry is only able to produce 60% of its maximum capacity. Therefore, it is needed to build scenarios that meet the needs of cassava for tape industries. The result shows four scenarios orientated to the model; 1. Scenario partnership, on this scenario the need of cassava for fermented cassava industry can be met, but make the needed cassava for consumption not fullfilled; 2. partnership scenario and acreage extension plant out as big as 2% per year, this scenario can't meet the need cassava for fermented cassava industry up to next 10 years; 3.The third scenario, partnership scenario and productivity step-up as big as 20 kw/ha is not overdose give influences even have can meet the need cassava next 10 years. The fourth scenario, partnership scenario and combined scenario, combination of scenarios 2 and 3, can supply cassava for the next 10 year.en_US
dc.language.isoiden_US
dc.subjectDynamic System Modelen_US
dc.subjectproductionen_US
dc.subjectavailabilityen_US
dc.subjectscenarioen_US
dc.titleMODEL SISTEM DINAMIK KETERSEDIAAN SINGKONG BAGI INDUSTRI TAPE DI KABUPATEN JEMBERen_US
dc.typeArticleen_US
Appears in Collections:LSP-Jurnal Ilmiah Dosen

Files in This Item:
File Description SizeFormat 
162-173_ MODEL SISTEM DINAMIK KETERSEDIAAN SINGKONG BAGI INDUSTRI TAPE.pdf286.1 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.