Please use this identifier to cite or link to this item:
https://repository.unej.ac.id/xmlui/handle/123456789/56622
Title: | PENENTUAN UKURAN OPTIMUM KAPASITOR BANK DAN DUMMY LOAD PLTMH DENGAN GENERATOR INDUKSI |
Authors: | Andi Setiawan |
Keywords: | Capacitor Bank, PLTMH, Asynchronous Generator |
Issue Date: | 2-Apr-2014 |
Series/Report no.: | Jurnal ROTOR;Volume 6 Nomor 2, November 2013 |
Abstract: | A technique of determining the size of the capacitor and a dummy loadfor microhydroelectric power generation system that uses inductionmachine as a generator is done by creating a model of the componentsand systems, loading scenario, and setting the system parameters inorder to obtain the optimum size of the capacitor and the dummy loadsimultaneously. Thesimulation results can already provide informationabout the size of all these components and simultaneously inform thelimits of the maximum active power that can be generated by thegenerator. In this paper the loading scenario is pure resistiveloading so it is not confirmed whether the method can also be used todetermine the size of the components of a system in which there areinductive loads. |
URI: | http://repository.unej.ac.id/handle/123456789/56622 |
ISSN: | 1979-018X |
Appears in Collections: | Fakultas Teknik |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Andi Setiawan_1.pdf | 5.49 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.