Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/56622
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAndi Setiawan-
dc.date.accessioned2014-04-02T00:07:36Z-
dc.date.available2014-04-02T00:07:36Z-
dc.date.issued2014-04-02-
dc.identifier.issn1979-018X-
dc.identifier.urihttp://repository.unej.ac.id/handle/123456789/56622-
dc.description.abstractA technique of determining the size of the capacitor and a dummy loadfor microhydroelectric power generation system that uses inductionmachine as a generator is done by creating a model of the componentsand systems, loading scenario, and setting the system parameters inorder to obtain the optimum size of the capacitor and the dummy loadsimultaneously. Thesimulation results can already provide informationabout the size of all these components and simultaneously inform thelimits of the maximum active power that can be generated by thegenerator. In this paper the loading scenario is pure resistiveloading so it is not confirmed whether the method can also be used todetermine the size of the components of a system in which there areinductive loads.en_US
dc.language.isootheren_US
dc.relation.ispartofseriesJurnal ROTOR;Volume 6 Nomor 2, November 2013-
dc.subjectCapacitor Bank, PLTMH, Asynchronous Generatoren_US
dc.titlePENENTUAN UKURAN OPTIMUM KAPASITOR BANK DAN DUMMY LOAD PLTMH DENGAN GENERATOR INDUKSIen_US
dc.typeArticleen_US
Appears in Collections:Fakultas Teknik

Files in This Item:
File Description SizeFormat 
Andi Setiawan_1.pdf5.49 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.