DSpace JSPUI
DSpace preserves and enables easy and open access to all types of digital content including text, images, moving images, mpegs and data sets
Learn More
Browsing by Author Widodo S, Jojok
Showing results 1 to 6 of 6
Issue Date | Title | Author(s) |
2015-12-13 | ANALISIS DAN PENGENDALIAN RISIKO KESELAMATAN KERJA DENGAN METODE SEMI KUANTITATIF BERDASARKAN AS/NZS 4360-1999 (Studi Kasus : Proyek Pembangunan Movenpick Hotel & Resort Jimbaran, Bali ) | Widodo S, Jojok; Suyoso, Hernu; FUAD, ZAKIYAL |
2015-12-07 | EVALUASI JADWAL PELAKSANAAN PEKERJAAN KONSTRUKSI JALAN DENGAN PENAMBAHAN JAM KERJA DAN ALAT KERJA MENGGUNAKAN METODE CRASHING (Studi Kasus Proyek Peningkatan Jalan Buduan – Bondowoso) | Arifin, Syamsul; Widodo S, Jojok; YUSRIANSYAH, LUTFI |
2015-12-13 | EVALUASI KESELAMATAN DAN KESEHATAN KERJA DITINJAU DARI ASPEK UNSAFE ACTION PADA PROYEK PEMBANGUNAN JEMBER ICON – JEMBER, JAWA TIMUR (PT. BANGUN KARYA SEMESTA) | Arifin, Syamsul; Widodo S, Jojok; Pratama, Wildan Aldy Januar Putra |
2014 | PENGARUH KESELAMATAN DAN KESEHATAN KERJA TERHADAP KINERJA PEKERJA PROYEK KONSTRUKSI PEMBANGUNAN FAVE HOTEL PROJECT SURABAYA (PT.ARCHIKON WIRATAMA) | Ratnaningsih, Anik; Widodo S, Jojok; Suryani, Herwi |
2014 | PENGARUH RISIKO K3 PADA SUMBER DAYA MANUSIA TERHADAP KEUNTUNGAN PROYEK FAVE HOTEL RUNGKUT-SURABAYA | Ratnaningsih, Anik; Widodo S, Jojok; Setyawan, Danang Ardi |
2015-12-13 | PERCEPATAN WAKTU PROYEK KONSTRUKSI DENGAN METODE CUT AND CRASHING (PROYEK PEMBANGUNAN LANJUTAN GEDUNG MA’HAD PUTERA/PUTERI STAIN JEMBER) | Widodo S, Jojok; Ratnaningsih, Anik; ULYA, WILDAN MUSABIQ |