Issue Date | Title | Author(s) |
2013-06-21 | Application of a Multispectral SPOT Image for Land Use Classification in Sampean Watershed | Irawan, Januar Fery; Indarto |
2016-08-19 | EVALUASI TEKANAN TANAH AKIBAT GALIAN PONDASI STUDI KASUS PROYEK PEMBANGUNAN GEDUNG AMG TOWER SURABAYA | Maruf, M. farid; Irawan, Januar Fery; FIRMANSAH, MOHAMMAD LUKI |
2015-12-08 | KAJIAN ULANG DAMPAK LALU LINTAS PEMBANGUNAN JEMBER ICON KABUPATEN JEMBER | Sulistyono, Sonya; Irawan, Januar Fery; Septiawan, Didit |
2018-03-26 | KECAMATAN SUMBERSARI DALAM MENGHADAPI BAHAYA ANGIN PUTING BELIUNG | Irawan, Januar Fery; Fibriani, Ike |
2019 | Model Estimasi Biaya Proyek Konstruksi Gedung Laboratorium 6 Lantai Universitas Jember Menggunakan Cost Significant Model | Irawan, Januar Fery; Arifin, Syamsul; RAHMATIN, Amaliyah Tulus |
2019-05-13 | Monitoring System Design of ECU (Electrical Control Unit) in Increasing Performance Efficiency of the Direct-Current Motor in Electrical Vehicle Using Fuzzy Logic | Irawan, Januar Fery; Utomo, Satryo Budi; Setiabudi, Dodi; Wijonarko, Wijonarko; Danuar, Danuar |
2017-03-03 | PENGUJIAN NILAI KOEFISIEN PERMEABILITAS TANAH DI PERUMAHAN MANDIRI LAND DAN PERUMAHAN GOR | Irawan, Januar Fery; Farid Ma’ruf; Sholeh, Edwin Amirul |
2017-04-19 | PENGUJIAN NILAI KOEFISIEN PERMEABILITAS TANAH DI PERUMAHAN MANDIRI LAND DAN PERUMAHAN GOR | Irawan, Januar Fery; Ma’ruf, M. Farid; Sholeh, Edwin Amirul |
2019-07-09 | Pengukuran Kesesuaian Kriteria Green Building Gedung IDB Integrated Health Science Universitas Jember Berdasarkan Standar Greenship Untuk Bangunan Baru Versi 1.2 | Irawan, Januar Fery; Ratnaningsih, Anik; WICAKSONO, Hendro |
2019-03-27 | Perancangan Sensor Pendeteksi Gerakan Tanah di Kawasan Perkebunan Kabupaten Jember Sebagai Upaya Menjaga Keselamatan Transportasi | Utomo, Satryo Budi; Irawan, Januar Fery |
2019-03-25 | Perancangan Sistem ECU (Electronics Control Unit) Mobil Listrik Berbasis Logika Fuzzy untuk Meningkatkan Efisiensi Daya | Irawan, Januar Fery; Setiabudi, Dodi |
2016-08-05 | PERENCANAAN BALOK GEDUNG C-DAST II UNIVERSITAS JEMBER DENGAN METODE BETON PRATEGANG | Nurtanto, Dwi; Wahyuningtyas, Winda Tri; Irawan, Januar Fery; Hayu, Gati Anisa; Sukmawati, Sri; Sulaiman, Bhisma Yugawinarta |
2018-08-01 | PERENCANAAN ULANG KAPASITAS DRAINASE DI JALAN KAWI KECAMATAN JENGGAWAH KABUPATEN JEMBER | Halik, Gusfan; Irawan, Januar Fery; Effendy, Muhammad Muchtar |
2018-03-26 | PKM KECAMATAN SILO YANG TERDAMPAK TANAH LONGSOR | Kristianta, F. X; Irawan, Januar Fery |
2016-08-19 | POTENSI LAJU INFILTRASI DI SUB KALI GALI, SUB KALI KEMUNING DAN SUB KALI DAWUHAN DAS SAMPEAN BARU KABUPATEN BONDOWOSO | Hidayah, Entin; Irawan, Januar Fery; FEBRIYANSYAH, MUHAMMAD ILHAM |
2015-12-01 | RANCANG BANGUN MESIN PENCETAK BATA UNTUK MENINGKATKAN KAPASITAS PRODUKSI PADA PAGUYUBAN PENGRAJIN BATA MERAH KALISAT JEMBER | Darsin, Mahros; Junus, Salahuddin; Irawan, Januar Fery |
2019-10-29 | Simulasi Numerik Groin DI Pantai Puger Kabupaten Jember | Irawan, Januar Fery; Kurniawan, Frendi Bagus |
2019-10-29 | Simulasi Numerik Tata Letak Bangunan Pemecah Gelombang DI Pantai Puger Jember Akibat Pasang Surut | Irawan, Januar Fery; A.W, Retno Utami; Ma, A Royyan Maulan |