• Login
    View Item 
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    •   Home
    • UNDERGRADUATE THESES (Koleksi Skripsi Sarjana)
    • UT-Faculty of Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Monitoring Pelaksanaan Pengendalian Progres Biaya Dan Waktu Dengan Metode Konsep Nilai Hasil (Earned Value) Pada Proyek Tower Caspian Grand Sungkono Lagoon Surabaya

    Thumbnail
    View/Open
    Yohandri Waldi - 161910301149 #.pdf (2.550Mb)
    Date
    2018-11-29
    Author
    Waldi, Yohandri
    Metadata
    Show full item record
    Abstract
    Perkembangan penduduk di Indonesia dinilai sangat pesat. Adanya perpindahan penduduk ke kota dapat memberikan sumbangan bagi kemajuan kota itu sendiri.
    URI
    http://repository.unej.ac.id/handle/123456789/88600
    Collections
    • UT-Faculty of Engineering [4203]

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Context

    Edit this item

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository