• Login
    Search 
    •   Home
    • DIPLOMA PROGRAMME PRACTICE REPORT (Laporan Diploma)
    • DP-Civil Engineering
    • Search
    •   Home
    • DIPLOMA PROGRAMME PRACTICE REPORT (Laporan Diploma)
    • DP-Civil Engineering
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-1 of 1

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Perbandingan Antara Perencanaan Dan Aktual Tentang Prosedur Dan Kebutuhan Waktu Pembetonan Pier Head Cast In Situ Metode Sosrobahu (Studi Kasus: Proyek Jalan Tol Layang Jakarta-Cikampek Zona 5) 

    ABSARI, Radiah Ulil (2019-10-09)
    Tujuan penelitian ini untuk mengetahui perbedaan prosedur dan kebutuhan waktu pembetonan pekerjaan pier head antara aktual dan rencana. Dan diharapkan dapat menjadi referensi dan rujukan bagi penulis lain mengenai topik ...

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository
     

     

    Browse

    All of RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Discover

    Author
    ABSARI, Radiah Ulil (1)
    SubjectPembetonan Pier Head Cast In Situ (1)... View MoreDate Issued2019 (1)Has File(s)Yes (1)

    UPA-TIK Copyright © 2024  Library University of Jember
    Contact Us | Send Feedback

    Indonesia DSpace Group :

    University of Jember Repository
    IPB University Scientific Repository
    UIN Syarif Hidayatullah Institutional Repository