dc.contributor.advisor | A. Kholiq A | |
dc.contributor.advisor | M. Hadi Makmur | |
dc.contributor.author | Fiqih Rio Junaedy, A. Kholiq A, M. Hadi Makmur | |
dc.contributor.author | Fiqih Rio Junaedy | |
dc.contributor.author | A. Kholiq A | |
dc.contributor.author | M. Hadi Makmur | |
dc.date.accessioned | 2016-01-18T07:03:10Z | |
dc.date.available | 2016-01-18T07:03:10Z | |
dc.date.issued | 2015 | |
dc.identifier.uri | http://repository.unej.ac.id/handle/123456789/71600 | |
dc.description.abstract | This research aimed to describe the implementation of revitalization of Village Unit Cooperative
“Mina Rahayu Pondok Mimbo” Sumberanyar Village, Sub District of Banyuputih, Situbondo
Regency, East Java Province. The research used qualitative approach with descriptive research type.
Data were collected by observation, interview, documentation, and literature study. Data validity
was examined using triangulation. Data analysis applied interactive analysis model of Miles and
Huberman. The results showed that the implementation of revitalization of Village Unit Cooperative
“Mina Rahayu Pondok Mimbo” Sumberanyar village, District of Banyuputih by the Local
Government of Situbondo Regency was not effective. This was evidenced by the fact that the office of
Village Unit Cooperative “Mina Rahayu Pondok Mimbo” was still closed (inactive cooperative) and
there were no activities or job activities undertaken by Board of Village Unit Cooperative “Mina
Rahayu Pondok Mimbo” and lack of attention from the local government as well as Department of
Cooperatives and SMEs and Department of Fisheries and Marine of Situbondo Regency until today | en_US |
dc.language.iso | id | en_US |
dc.publisher | UNEJ | en_US |
dc.subject | implementation, revitalization, KUD Mina Rahayu Pondok Mimbo | en_US |
dc.title | PELAKSANAAN REVITALISASI KOPERASI UNIT DESA MINA RAHAYU PONDOK | en_US |
dc.type | Article | en_US |