Analisis Uji Pressure Build Up Sebagai Dasar Optimasi Produksi pada Sumur AUD-1
Abstract
The AUD-1 well is an exploration well with a multilayer reservoir consisting of
four reservoir layers, one oil reservoir and three gas reservoirs. The reservoir
capability of the AUD-1 well can be analyzed through the Pressure Build Up test
with well test interpretation. The results obtained based on the well test
interpretation are reservoir characteristic parameters such as reservoir pressure,
permeability and well skin. Well, reservoir and boundary models will also be known
based on matching derivative curve models. The AUD-1 well, which has had its
reservoir capacity evaluated, will undergo development planning so that optimal
production can be carried out. The scope of development in question is determining
the appropriate tubing diameter so that the production carried out can produce the
most optimal flow rate. The selected tubing diameter range is between 2.5 inches –
7 inches taking into account the availability of the company's logistics stock. The
results of the tubing sensitivity analysis show that tubing with a diameter of 2.5
inches will produce minimum production and tubing with a diameter of 7 will
produce maximum production, but the optimum production rate of the AUD-1 well
will greatly depend on the design of the forecast production rate by the development
team.
Collections
- UT-Faculty of Engineering [4098]