Show simple item record

dc.contributor.authorNISA, Nurmala Agita
dc.date.accessioned2024-07-15T01:26:33Z
dc.date.available2024-07-15T01:26:33Z
dc.date.issued2023-07-27
dc.identifier.nim191810101020en_US
dc.identifier.urihttps://repository.unej.ac.id/xmlui/handle/123456789/122180
dc.description.abstractPlanning project activities is an important issue that needs to be considered. This is because planning serves as the foundation for completing a project in an optimal timeframe. The timing of construction project implementation must be designed optimally to avoid delays or excesses, as well as other impacts such as significant cost increases. Project scheduling is a part of the planning process that includes information about the planned schedule and project progress in terms of resource performance, including costs, workers, equipment, materials, and project duration. The scheduling model used in this research is the Precedence Diagram Method (PDM). PDM is a network diagram that falls under the Activity on Node (AON) group, which identifies critical paths. Critical paths are the paths of activities that must not be delayed. When it comes to accelerating the project duration, these critical paths are the ones that will be expedited. PDM calculations can be solved using the Genetic Algorithm approach. Genetic Algorithms are stochastic search algorithms based on natural selection and genetic mechanisms. Genetic Algorithms begin with an initial random set of solutions called a population, which represents the constraints of an optimization problem. This study used 10 iterations, where the population from iteration 1 is used as the population for iteration 2, and so on. To obtain the final chromosome, the same calculations as in iteration 1 are performed. Once the chromosomes for the entire population size are obtained, the chromosome with the minimum acceleration cost is selected. In the 10th iteration, the best chromosome with a fitness value of 0.2650 was found. This chromosome contains the genes 1 1 4 4 1 1, which means the optimal duration acceleration with the least cost increase is achieved by extending the working hours of Task A by 1 hour, Task B by 1 hour, Task C by 4 hours, Task D by 4 hours, Task E by 1 hour, and Task F by 1 hour.en_US
dc.language.isootheren_US
dc.publisherFakultas Matematika dan Ilmu Pengetahuan Alamen_US
dc.subjectPrecedence Diagram Methoden_US
dc.subjectBiayaen_US
dc.subjectWaktuen_US
dc.subjectAlgoritma Genetikaen_US
dc.titlePenerapan Precedence Diagram Method (Pdm) Untuk Optimasi Penjadwalan dan Biaya Proyek dengan Pendekatan Algoritma Genetikaen_US
dc.typeOtheren_US
dc.identifier.prodiMatematikaen_US
dc.identifier.pembimbing1Dr. Agustina Pradjaningsih, S.Si., M.Si.en_US
dc.identifier.pembimbing2Abduh Riski, S.Si., M.Si.en_US
dc.identifier.validatorvalidasi_repo_iswahyudi_Mei_2024en_US
dc.identifier.finalization0a67b73d_2024_07_tanggal 10en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record