Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/88600
Title: Monitoring Pelaksanaan Pengendalian Progres Biaya Dan Waktu Dengan Metode Konsep Nilai Hasil (Earned Value) Pada Proyek Tower Caspian Grand Sungkono Lagoon Surabaya
Authors: Sukmawati, Sri
Trisiana, : Anita
Waldi, Yohandri
Keywords: Tower Caspian Grand Sungkono Lagoon
Issue Date: 29-Nov-2018
Abstract: Perkembangan penduduk di Indonesia dinilai sangat pesat. Adanya perpindahan penduduk ke kota dapat memberikan sumbangan bagi kemajuan kota itu sendiri.
URI: http://repository.unej.ac.id/handle/123456789/88600
Appears in Collections:UT-Faculty of Engineering

Files in This Item:
File Description SizeFormat 
Yohandri Waldi - 161910301149 #.pdf2.61 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools