Please use this identifier to cite or link to this item:
https://repository.unej.ac.id/xmlui/handle/123456789/86506| Title: | Faktor-Faktor Yang Mempengaruhi Biaya Dan Waktu Pelaksanaan Pekerjaan Dinding Bata Ringan dan Beton Cetak |
| Authors: | RATNANINGSIH, Anik TRISIANA, Anita RAMADANI, Ira Laely Firdausi |
| Keywords: | Bata Ringan Beton Cetak |
| Issue Date: | 26-Jul-2018 |
| Series/Report no.: | 141910301093; |
| URI: | http://repository.unej.ac.id/handle/123456789/86506 |
| Appears in Collections: | UT-Faculty of Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Ira Laely Firdausi Ramadani - 141910301093.pdf | 5.92 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
Admin Tools