Please use this identifier to cite or link to this item:
https://repository.unej.ac.id/xmlui/handle/123456789/71534
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Hermanto Rohman | - |
dc.contributor.advisor | Agus Suharsono | - |
dc.contributor.author | Ana Agustina | - |
dc.contributor.author | Agus Suharsono | - |
dc.contributor.author | Hermanto Rohman | - |
dc.date.accessioned | 2016-01-18T03:09:49Z | - |
dc.date.available | 2016-01-18T03:09:49Z | - |
dc.date.issued | 2015 | - |
dc.identifier.uri | http://repository.unej.ac.id/handle/123456789/71534 | - |
dc.description.abstract | This research aimed to evaluate the PNPM MPd Field of Women Savings and Loan in the Village Balet Baru Sukowono District of Jember. This research used descriptive method with qualitative approach and the focus of this study is on the tuition (SPP) program. Purposive sampling technique was used to get respondents. There are two Data sources; primary data and secondary data. Data collection techniques used; observation, interviews, and documentation methods. This study used a technique authenticity of data with triangulation of data sources. Data were analyzed using an interactive model of Miles and Huberman. The results showed that the evaluation stage PNPM MPd Savings and Loan Sector in Rural Women in Balet baru in 2013-2014; namely the planning stage include socialization, brainstorming, writing proposals, verification, priority proposals MAD, MAD musdes result information. Disbursement and implementation phase covers and Musdes Accountability. While the completion stage refund fees to the CGU. At the planning stage of socialization carried out to follow up activities of MAD socialization, women's groups have determined the proposal of the aspirations that SPP. Recommendations TV SPP's proposal is for the village of New Ballet of 2 groups with a loan amount of USD 66 million, -. At the implementation stage that disbursement of funds directly and a fee of 5% of total loans has completed all the requirements and reporting and in accordance with the planned use of the funds. At the completion stage show that repayment of SPP funds have not been up to the CGU. In the PNPM activities Field SPP MPD is carried out in accordance with the PTO. SPP activity was evaluated based on the criteria of equity, adequacy, accuracy, and community satisfaction. Most are in accordance with the objectives of this program | en_US |
dc.language.iso | id | en_US |
dc.publisher | UNEJ | en_US |
dc.subject | Evaluation Program, SPP, PNPM MPd | en_US |
dc.title | ANG SIMPAN PINJAM PEREMPUAN DI DESA BALET BARU KECAMATAN | en_US |
dc.type | Article | en_US |
Appears in Collections: | SRA-Agriculture And Agricultural Technology |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Ana Agustina.pdf | 291.37 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.