Collection's Items (Sorted by Submit Date in Descending order): 41 to 60 of 141
Issue Date | Title | Author(s) |
2016-08-16 | RANCANG BANGUN BAGIAN DINAMIS MESIN CNC ROUTER MILLING | Muttaqin, Aris Zainul; Fachri, Boy Arief; Pratama Arifin, Deni Anggara |
2016-08-12 | RANCANG BANGUN MESIN CNC BUBUT KAYU (BAGIAN STATIS | Mulyadi, Santoso; Rozy, M. Fahrur; Faton Al Ghani, Bahtiar |
2016-08-05 | PERANCANGAN DAN PEMBUATAN ALAT PENCETAK BRIKET (MANUAL) UNTUK PEMANFAATAN LIMBAH SERBUK KAYU | ARBIANTARA, Hari; LISTYADI, Digdo; HIDAYAH, Muhammad Taufiq |
2016-06-28 | PERANCANGAN DAN PEMBUATAN ALAT PEMOTONG SINGKONG : Perancangan pada mekanisme dinamis(Sproket, Rantai, Bantalan dan Roda gila) | KRISTIANTA, Fx; SIDARTAWAN, Robertus; NUGROHO, Hendri Nurcahyo Adi |
2016-01-26 | PROSES MANUFAKTUR PEMBUATAN BODI (BAGIAN ATAP DAN KACA ACRILIC TMUNEJ-1 HYBRID VEHICLE | Kristianta, .F.X; Diantoro, Roni Aris |
2015-03-23 | PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (BAGIAN POROS DAN BANTALAN) | Igar Putra Pamungkas . |
2015-03-23 | RANCANG BANGUN MESIN PENYANGRAI BIJI KOPI (BAGIAN DINAMIS) | Hendra Sanjaya 091903101014 |
2015-03-23 | PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (BAGIAN RANGKA) | Galih Priambodo Utomo 111903101003 |
2015-03-23 | PERANCANGAN DAN PEMBUATAN MESIN DAUR ULANG GYPSUM (BAGIAN DINAMIS) | Binar Arum Oktavia |
2015-03-23 | PERANCANGAN DAN PEMBUATAN MESIN DAUR ULANG GYPSUM (BAGIAN STATIS) | Aris Wijaya 121903101005 |
2014-12-01 | PERANCANGAN DAN PEMBUATAN SUDU TURBIN ANGIN SUMBU VERTIKAL TIPE DARRIEUS | Rakhmad Bagas Priyambodo |
2014-12-01 | PERANCANGAN DAN PEMBUATAN RANGKA SUDU TURBIN ANGIN SUMBU VERTIKAL TIPE DARRIEUS | Hendro Istianto |
2014-12-01 | DESAIN ULANG MESIN PENGHANCUR SAMPAH ORGANIK (BAGIAN STATIS) | Fikri Amin |
2014-11-06 | PROSES MANUFAKTUR DAN ASSEMBLING KINCIR ANGIN SUMBU HORIZONTAL 3 SUDU ( BAGIAN SUDU DAN HUB ) | Mohammad Imroni |
2014-11-06 | PROSES MANUFAKTUR DAN ASSEMBLING KINCIR ANGIN SUMBU HORIZONTAL 3 SUDU [BAGIAN EKOR PENGGERAK (TAIL VANE) DAN MEKANISME YAW] | Moh. Iqbal Hakiki |
2014-11-06 | PERANCANGAN DAN PEMBUATAN TUAS TRANSMISI TMUNEJ-1 HYBRID VEHICLE | Hari Yudha Dwi Septian |
2014-11-06 | PROSES MANUFACTUR DAN ASSEMBLING KINCIR ANGIN TIPE HORIZONTAL (BAGIAN TRANSMISI) | Ahmad Hamdan Yuwafi |
2014-07-21 | PERANCANGAN DAN PEMBUATAN SISTEM BODY (BAGIAN RANGKA BODY DEPAN) TMUNEJ-1 HYBRID VEHICLE | Muhammad Khairil Umam |
2014-07-21 | PROSES MANUFAKTUR (BAGIAN BODI UTAMA) TMUNEJ-1 HYBRID VEHICLE | JERY BANAR PRASETIYO |
2014-07-21 | PROSES MANUFAKTUR PEMBUATAN PINTU DAN KACA ACRILIC TMUNEJ-1 HYBRID VEHICLE | Catur Bagus Widiyanto |
Collection's Items (Sorted by Submit Date in Descending order): 41 to 60 of 141