Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/121002
Full metadata record
DC FieldValueLanguage
dc.contributor.authorALFINAINI, Nur Aini Dwi-
dc.date.accessioned2024-06-05T06:15:30Z-
dc.date.available2024-06-05T06:15:30Z-
dc.date.issued2023-07-17-
dc.identifier.nim191910401001en_US
dc.identifier.urihttps://repository.unej.ac.id/xmlui/handle/123456789/121002-
dc.description.abstractTo achieve sustainable energy needs in Indonesia, alternative energy sources are needed to reduce the use of fossil fuels which are decreasing every year. One of them is by using alternative energy Liquefied Natural Gas (LNG) from Coal Bed Methane (CBM). There are several stages in the LNG production process from CBM, namely dehydration unit, acid gas removal unit, fractination unit and refrigeneration and liquefaction unit. This plant is designed with a production capacity of 25 MMSCFD/Year with an operating time of 330 days/year. The raw materials needed are CBM as much as 31.0205838 MMSCFD. The process chosen in making LNG at this plant is the adsorption process. The selection of the process is carried out with consideration that it can remove water and mercury content to a maximum limit of less than 10 ppm, this is in accordance with the desired product specifications. This plant will operate in KEK Tanjung Api-Api, Banyuasin Regency, South Sumatra with an estimated start of operation in 2030. Based on the results of the evaluation of economic analysis, it can be concluded that the establishment of an LNG plant from CBM waste with a capacity of 25 MMSCFD / Year is feasible to be established with details of Pay Out Time (POT) 3.09 years, Internal Rate of Return (IRR) 28.4% and Break Event Point (BEP) of 43.56%.en_US
dc.language.isootheren_US
dc.publisherFakultas Tekniken_US
dc.subjectLNGen_US
dc.subjectCBMen_US
dc.subjectAdsorptionen_US
dc.titlePra Rancangan Pabrik Liquefied Natural Gas (Lng) Dari Coal Bed Methane (Cbm) Dengan Kapasitas 25 Mmscfd/Tahunen_US
dc.typeOtheren_US
dc.identifier.prodiTeknik Kimiaen_US
dc.identifier.pembimbing1Dr. M. Maktum Muharja Al Fajri, S.T.en_US
dc.identifier.pembimbing2Zuhriah Mumtazah, S.Si., M.Si.en_US
dc.identifier.validatorvalidasi_repo_iswahyudi_Mei_2024en_US
dc.identifier.finalization0a67b73d_2024_06_tanggal 05en_US
Appears in Collections:UT-Faculty of Engineering

Files in This Item:
File Description SizeFormat 
TA LNG dari CBM 40 halaman.docx
  Until 2028-07-06
1.19 MBMicrosoft WordView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools