Please use this identifier to cite or link to this item: https://repository.unej.ac.id/xmlui/handle/123456789/120032
Title: Identifikasi dan Pengendalian Risiko Dominan Proyek Preservasi Jalan dan Jembatan dengan Metode Hira dan Hazop
Authors: SANI, Sakina Arifma
Keywords: HAZOP
HIRA
RISK
PARETO CHART
Issue Date: 9-Jan-2023
Publisher: Fakultas Teknik
Abstract: The road preservation project is one of the infrastructure project. Infrastructure has many risks and uncertainties in its implementation process. These risks can affect the productivity, quality and budget of the project. Therefore it is necessary to plan risk control in project implementation. The planning stage consists of risk identification using the HIRA method and a severity index. The risk value that has been obtained is then determined by the dominant risk using the Pareto diagram and controlled by the dominant risk using the HAZOP method. The results of risk identification obtained 26 variables. Furthermore, calculations were carried out with a pareto diagram and obtained 17 dominant risks and 2 high dominant risk control obtained 9 recommended solutions.
Description: Validasi dan Finalisasi oleh Taufik Tgl 29 Februari 2024
URI: https://repository.unej.ac.id/xmlui/handle/123456789/120032
Appears in Collections:UT-Faculty of Engineering

Files in This Item:
File Description SizeFormat 
Sakina Arifma Sani_191910301121_Draft Skripsi Fix.pdf
  Until 2028-01-09
2.56 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Admin Tools